Universe dating ru

02-Oct-2017 18:20

Primary power for the facility is a Liquid Fluoride Thorium Reactor (LFTR) rated for 1 GW total output, with a reactor life of 70 years at maximum capacity.

A geothermal generator has also been installed to take advantage of the region’s volcanic activity.

Other non-anomalous life support and utility systems may be maintained in accordance with standard Foundation Maintenance Protocol, Section 101.5 (Mission Critical Components).

Wherever possible, non-anomalous materials and resources are to be used for SCP-2000’s maintenance and repair.

Each SRA’s function must be checked semi-annually and replaced as necessary.

Technicians servicing XACTS components may refer to Document XACTS-864, rev 1.3.0.

No personnel below Level 5/2000 clearance are permitted access to SCP-2000 below Sub-level 3.

All personnel assigned to SCP-2000 must submit to a neural archetype scan on a monthly basis.

Whether this information black-out is the result of accident or design is impossible to determine.

The mission critical portion of this installation begins 75m below ground level and extends to a 100m depth.

Technicians servicing XACTS components may refer to Document XACTS-864, rev 1.3.0.No personnel below Level 5/2000 clearance are permitted access to SCP-2000 below Sub-level 3.All personnel assigned to SCP-2000 must submit to a neural archetype scan on a monthly basis.Whether this information black-out is the result of accident or design is impossible to determine.The mission critical portion of this installation begins 75m below ground level and extends to a 100m depth.One Pseudo-Riemannian manifold has been initiated at the entrance to Sub-level 4, and must remain open at all times.